Construction laborers, Riverside Park, May 16, 1934.
Photo: New
York City Department of Parks and Recreation:
”Group of black laborers is shown laying
foundation stones in the shallow river bed that was to become part of the
Riverside Park expansion. One of the largest public improvements to ever
take place in New York City, this massive project decked over the New York
Central Railroad, doubled the park's acreage, and added the scenic Henry
Hudson Parkway along its perimeter. Financed by the Federal Works Progress
Administration (WPA), the workforce numbered in the many thousands. Notice
the harmonica player at center who tries to maintain the work crew's spirits
in the face of their daunting task.” (Parks Department text) In the
background, far left, Grant's Tomb. The tall building to its right is
Riverside Church. Then apartment buildings along Riverside Drive from 120th
Street to 116th Street. The workers are laying down stones taken from the
railroad bed to stabilize the river bank. This photo was taken very close
to the doomed Columbia University Yacht Club at 113th Street. The steeply
terraced park was about to be totally reconstructed into two relatively flat
area separated by a high stone retaining wall, with the NYCRR tracks beneath
the high part.
Prior to the New Deal, the New York Central Railroad ran along the
Hudson River on the west side of Manhattan, not only cutting residents off
from the river, but also spewing coal smoke and soot into the residential
areas. A project was launched in 1929 to bury the railroad tracks under
parkland but it never got off the ground due to lack of funding, and by 1934
what we know as Riverside Park today was a "wasteland ..." stretching from
72nd Street to 181st Street ... "a vast low-lying mass of dirt of and mud
... unpainted, rusting, jagged wire fences along the tracks barred the city
from its waterfront; in the whole six miles, there were exactly three
bridges on which the tracks could be crossed, and they led only to private
boating clubs ... [a] stench [hung] over Riverside Drive endlessly after
each passage of a train carrying south to the slaughterhouses ... carload
after carload of cattle and pigs..."[1, pp. 65-67]
Riverside Park Hooverville, 1933. Click to enlarge.
|
Plus "fifty-two shacks comprising the veterans' camp between 72nd and 79th
Street ... [and] eighty-three other shacks along Riverside Drive on the
Hudson River ... [plus] a reinforced coal hopper at the foot of 96th
Street... [plus] old docks [plus] eleven shacks built around the piling
tinder [at] the dock at 96th Street ... these wharf dwellers are literally
clinging to the underpinnings of the rotting dock structure"[2].
”The fifty-two shacks comprising the veterans' camp between 72nd
Street and 79th Street, between Riverside Drive and the Hudson River [inset
photo] will be torn down on May the first. Provision has been made for the
Department of Public Welfare to transfer these men to a farm at
Greycourt. There are eighty-three other shacks along Riverside Drive on the
Hudson River, housing over one hundred men, which will be torn down at the
same time that the Hudson River Yacht Club and the Columbia Yacht Club will
be demolished.”[7]
West Side Improvement 1937.
Photo: NYC Parks Department Archive. Click to enlarge.
|
In 1934 Robert Moses launched the West Side Improvement Project to create
from this a mess a 5½-mile-long park, an express highway, and two
boat basins. He obtained funding from “many sources ... Governor
Lehman approved a loan of grade-crossing-elimination money to the New York
Central. Federal, state, and City grade-crossing moneys, City street and
park funds raised by assessment, railroad funds, money obtained through the
sale of bonds of a municipal authority, Federal and state highway money and
relief funds were also included.”[3] Moses is (as always) deliberately
vague about the funding, and doesn't even mention the labor. But this was a
massive work project and Moses commanded an army of as many as 80,000 relief
workers during this period: if they didn't build it, who did?
Robert Caro, as usual, to the rescue [1]: Moses calculated
that he had to find $109 million for the project, and Caro recounts how he
did it; it's the kind of feat only Moses could pull off and Caro's pages are
worth a read if you want to make your head spin. But to summarize (and
perhaps oversimplify very slightly 14 pages of twists and turns),
Moses received (in round numbers) $42M for the project from the Federal
government ($30M from the PWA and CWA, $12M from federal interstate highway
funds), $23M from the City and State, and $3M from private sources (this
adds up to $68M, considerably short of his original estimate for reasons
explained in Caro: cutbacks, sleight of hand, etc).
Today Riverside and Fort Washington Parks are an essential fixture of
Manhattan's West Side. They include not only parkland, but a mall
overlooking the Hudson River; baseball, football, and soccer fields,
playgrounds, sprinklers, wading pools, running tracks, volleyball courts,
tennis courts, bicycle paths, skate parks, and boat basins. It's really one
big long park from 72nd Street to 181st Street, but there is an invisible
boundary at 155th Street with Riverside Park to the south and Fort
Washington Park to the north.
References:
- Caro, Robert A., The Power Broker - Robert Moses and the Fall of New York, Vintage Books
(1974), pp.526-540. According to Caro, Moses obtained $13.5M from NY
Central (which NY Central obtained from the State), $12M from federal
interstate highway funds, $10M from a city tax levied on Riverside Drive
property owners, $1.766M from PWA for materials to build the 79th Street Boat Basin, $3M from the CWA for
labor on the Boat Basin, another $20M from the CWA for materials and
equipment for the rest of the park up to 192nd Street, another $5M in labor
from the CWA for the park and highway north of 192nd Street, and finally by
sale of $3M in Henry Hudson Parkway Authority bonds to the banks. So of the
$58M that Moses raised for the project, $42M came directly from the federal
government, $23M came from the City and State, and only $3M (4%) came from
private sources via bond sales to banks.
- NYC Parks Dept press
release of April 27, 1934, announcing commencement of work on the
extension of Riverside Park along the west side of the New York Central
Railroad tracks as part of the West Side Improvement Project using relief
labor: Demolition of squatter shacks, coal hoppers, old docks.
- Moses, Robert, Public Works, McGraw Hill (1970), p.183-188.
- NYC Parks Dept press release archive for
July-December 1934: numerous documents regarding the Columbia University
Yacht Club in Riverside Park, which Moses demolished.
- The
Columbia Yacht Club (gallery), Tours by Gary at
blogspot.com.
- NYC Parks Dept press release of July
31, 1934, "West Side Improvement", the first phase of the construction
of Riverside Park, which states that after the retaining walls for the
railroad are built, "it will be possible to proceed with the landscaping
work wilth relief labor."
- NYC Parks Dept press
release of October 29, 1934, Memorandum on Organization of Work Relief
Projects: “The relief workers in the parks had been recruited through
the National Reemploymont Service and passed through the Civil Works
Administration to the various city departments. The Park Department inherited
69,000 of them.”
- NYC Parks Dept press release
of February 27, 1935: The beginning of work on the extension of
Riverside Park along the west side of the New York Central Railroad
tracks. “Dirt and rock fill is being brought into the area north of
72nd Street at the rate of 500 truck loads a day ... The areas not occupied
by the highway will be landscaped and utilized·for various park
activities. At 79th Street, which will be carried down to the waterfront by
means of a grade crossing elimination, there will be a boat basin, and just
to the south a large swimming bowl is planned. At 96th Street there will bo
a second grade crossing elimination.
A total of 1,000,000 cubic yards of fill is required to reclaim the entire
area. Of this amount 800,000 cubic yards will come from the railroad cut
under construction by the New York Central from 42nd to 64th Streets. Two
contracts already have been let calling for delivery of 400,000 cubic yards
during the next four months at the rate of 4,000 cubic yards a day.
All the stone taken from the cut will be used to construct a rip-rap wall
along the park waterfront. Work on this wall is expected to begin
shortly. Relief labor will be used entirely. A squad of relief
workers aided by several cranes and 'bull dozers' (grading machines) already
are at work on the dirt now coming in.”
- NYC Parks Dept press release
of January 10, 1936: ”The Board of Estimate and Apportionment has
received the Department of Parks' plans and specifications and estimates of
cost for the covering of the New York Central Railroad tracks, continuation
of the West Side Highway and park restoration through the entire length of
Riverside Park ... The plan calls for the complete covering of the New York
Central Railroad tracks through Riverside Park and the covering is used for
promenades and overlooks banked by trees and landscaping.”
- NYC Parks Dept press release
of October 3, 1937: “The Department of Parks announces that on
Tuesday, October 12th, the 6.7 miles of parkway now under construction in
Riverside and Fort Washington Parks in connection with the West Side
Improvement will be officially opened to the public, thereby adding another
vital link in a great arterial express highway and parkway system for the
City of New York.
Besides the parkway there will also be available for
public use, 78 acres of play area including children's playgrounds, athletic
fields and tennis courts. The entire area west of the railroad at Inwood
Hill Park extending from Dyckman Street to the Harlem Ship Canal, will be
devoted exclusively to active recreation. Promenades and winding foot paths
with benches under shade trees will be available for pedestrians and those
seeking rest and quiet. Plans have also been developed for marine
recreational facilities in the form of four boat basins located respectively
at 79th Street, 96th Street, 148th Street and Dyckman Street. All but the
148th Street basin which will be under the jurisdiction of the Commissioner
of Docks, will be operated by the Department of Parks. The basins at 79th
and 96th Streets are actually under construction.” If the 96th Street
and 148th Street boat basins were ever constructed, there is no trace of
them now. “The opening of the West Side Improvement through
Riverside and Fort Washington Parks from 72nd to Dyckman Streets will
provide at a total cost of $24,340,000., an immediate usable section of a
great marginal waterfront development. 132 acres of new park land valued at
$30,000,000., have been made by filling land under water and covering of the
railroad tracks. Approximately 3,000,000 cubic yards of fill from exterior
sources have been used.”
- NYC Parks Dept press release of
October 11, 1937, announcing the opening of the West Side Improvement
in Riverside and Fort Washington Parks, a $24,340,000 project.
- Interesting Places in the
Parks of New York City, undated document in the October section of the
1937 Parks Department press release archive: “WEST SIDE IMPROVEMENT -
The plan for the West Side Improvement along Riverside Drive from 72nd
Street to Dyckman Street includes a wide variety of facilities for active
recreation, When this work is completed, there will be eight children's
playgrounds with wading pools and recreational buildings; twelve full-size
baseball fields and seven soft ball diamonds. A miniature Randall's Island
track and field layout will be a feature. Thirty handball, twenty horseshoe
and fifteen tennis courts, plus a large number of shuffle boards, basket
ball, paddle tennis and other court games are being constructed. Three new
boat basins will be built for motor boat fans; bicyclists will have an
exclusive river front track, while roller skating enthusiasts will have
eighteen city blocks of track and two roller hockey rinks.
- NYC Parks Dept press
release of March 2, 1940, announcing the opening of the 79th Street Boat
Basin.
- Riverside
Park Construction 1934-37 (gallery), New York City Department of Records
at
nycma.lunaimaging.com.
- Klein, Milton M., The Empire State: A History of New York, Cornell University Press (2005).
"...and [Moses] strung together federal and state grants for New York
State's largest public work, the $205 million West Side Improvement which
extended Riverside Park over the New York Central Tracks and built the Henry
Hudson Parkway to connect with the Saw Mill River Parkway." (Obviously
there were cost overruns after his original $109 million estimate.)
- New York City Parks
Department press release, December 1938: Progress in the Park
Department: 1934-1938.
- New York City Parks
Department press release, August 11, 1939, New Police Precinct for
Riverside Park.
- New York City Parks
Department press release, June 23, 1939: Opening of recreation areas in
Riverside and Inwood Hill Parks, 145th-155th Streets and from Dyckman Street
north to the top of Manhattan (previously a dump), with ceremonies in which
Robert Moses and Alexander MacGregor, Assistant to the Works Progress
Administrator, participated. “The work was planned by the Park
Department and performed by the Works Progress Administration.”
- New York City Parks
Department press release, November 30, 1939, A million tulips planted
in Riverside Park and along Henry Hudson Parkway.
- Federal Writers' Project, The WPA Guide to New York City, Random House (1939), pp.284-289.
- New York City Parks
Department press release, July 15, 1941, Hudson River overlook
at 149-150 Street “which was built by the Works Projects
Administration”.